The Qinshan Nuclear Power Plant I is located in Haiyan county, Zhejiang province. Phase I project employed Chinese-designed CNP300 pressurized water reactor, with an installed capacity of 300 MWe and a 30-year designed operation life. Integrated localization rate exceeds 70%. In March 1985, the FCD was completed onto the nuclear island based at the site and commercial operation began in April 1994.
(This English version is for your reference only.In case any discrepancy exists between the Chinese and English context, the Chinese version shall prevail.)